Title COMMISSIONING PLAN FOR LCLS II 2 K COLD BOX
Authors Ritendra Bhattacharya, Dana Arenius, Connor Kaufmann, Nathaniel Laverdure, Christopher Scanlon, John Hogan, Michael Bevins
JLAB number JLAB-ACC-19-3154
LANL number (None)
Other number DOE/OR/23177-5412
Document Type(s) (Meeting) 
Category: Cryo
Associated with EIC: No
Supported by Jefferson Lab LDRD Funding: No
Funding Source: High Energy Physics (HEP)
 

Meeting
Paper compiled for CEC-ICMC 2019 Cryogenic Engineering Conference

Proceedings
IOP Conf.Ser.Mater.Sci.Eng. 755
Edited By
IoP (2020)
Page(s) 012121
Publication Abstract: Commissioning of the LCLS II cryogenic plant has been planned with respect to electrical and mechanical systems checkout, equipment cleanup, cool-down, and individual performance evaluation. This plant consists of warm and cold storage, helium compressors, 4.5 K and 2 K cold boxes, and all auxiliaries typical for helium refrigeration processes. The 2 K cold box, consisting of five cold compressors in series to produce the flow and pressures necessary for 2K operation , will be the last equipment installed and, along with an additional 10,000 L helium Dewar, will allow the entire plant to be commissioned as a single entity. The pre-commissioning stages, commissioning plan for 2 K cold box without connecting to the LCLS II LINAC, additional test equipment needed to simulate the loads, all process studies and associated controls are described herein.
Experiment Numbers:
Group: Cryogenics
Document: pdf
DOI: https://doi.org/10.1088/1757-899X/755/1/012121
Accepted Manuscript: Bhattacharya_2020_IOP_Conf._Ser. _Mater._Sci._Eng._755_012121.pdf
Supporting Documents:
C2Po1G-05 [42] LCLS II CC Commissioning Plan V3.pdfManuscript post Reiew (Supporting)
Supporting Datasets: