Jefferson Lab > CIO > IR
Privacy and Security Notice

Publications

Publication Information

Title Injection Options for 12 GeV CEBAF Upgrade
Authors Reza Kazimi, Jay Benesch, Yu-Chiu Chao, Joseph Grames, Geoffrey Krafft, Michael Tiefenback, Byung Yunn, Yuhong Zhang
JLAB number JLAB-ACO-05-363
LANL number (None)
Other number DOE/ER/40150-3408
Document Type(s) (Meeting) 
Associated with EIC: No
Supported by Jefferson Lab LDRD Funding: No
 

Meeting
Poster compiled for PAC 05
Publication Abstract: Jefferson Lab is planning a major upgrade of CEBAF accelerator from 6 to 12 GeV. The injection energy needs to be increased accordingly from 67 MeV to 123 MeV. While the present 100 keV electron gun and beam formation up to 5 MeV would remain unchanged, the accelerating SRF modules in the current injector cannot provide the desired energy increase. Two options for attaining the energy increase have been considered: (1) replacing the present injector SRF modules with new, higher gradient modules, or (2) re-circulating the electron beam through the existing cryomodules to achieve the necessary energy gain in two passes. In this paper we present computer simulation studies for these two options of the injector upgrade and list their advantages and disadvantages.
Experiment Numbers: other
Group: Ops Scientists
Document: pdf
DOI:
Accepted Manuscript:
Supporting Documents:
Supporting Datasets: